| |
This project was undertaken for South East Essex University on behalf of AMEC Design and Build Team based at AMECS Ipswich Offices.
AJC undertook the groundwork elements of the job from Piling Mat to the Concrete Slabs and all the Structural Concrete and Rebar on the Hollow Rib floor from ground level to the sixth storey. |
|